Announcing Fortune’s newest property in
Hillsboro, Oregon!
The phase 1 development at Fortune Oregon 1 provides 7.8 MW of concurrently maintainable critical load; the property meets Essential Facility standards for seismic, snow, and wind, and has received substantial upgrades for electric utility service. DPR/Fortis Construction served as the General Contractor. Rosendin Electric and Apollo performed the electrical and mechanical work respectively. Lee Technologies provided commissioning oversight and integrated commissioning testing services.
Phase 1 facility features include:
- High-Availability, concurrent maintainability on all components
- Entire critical load fully Level 5 Commissioned
- Supports average energy densities of 200 watts/sq ft
- Structurally Sound: FEMA 356 “Essential Facility” category
- Seismically Reinforced: Building and all improvements seismically reinforced to a 1.5 Structural Importance Factor
- Carrier-Neutral: Six Tier 1 carriers on-property: Level 3, AboveNet, CenturyLink (Qwest), AT&T, Verizon Business and Tata Communications.
- Low latency: 17 msRT to San Jose, 3.5 msRT to Seattle, 45 msRT to Chicago, and 87 msRT to Tokyo
